![]() If it is rejected the applicant is notified of the reason. A description the work to be done must be completed and submitted to be reviewed by the appropriate Subcode official(s). You must complete a Permit Applications are available from the Construction office daily from 9am to 4:30pm. We strongly encourage you to call the Construction Office and check to see if a permit is needed. Ordinary maintenance projects such as painting and carpeting in residential structures, replacement of storm windows and doors of the same size openings, wall paper, replacement of kitchen cabinets, etc. They are Building, Electric, Plumbing, Fire, and Elevator. The permit consists of five different Subcode sections as needed. The purpose of the permit is to allow our inspectors to observe the progress of the work to be sure it is safe and meets code. A construction permit is permission to do most kinds of work on a dwelling or other type of commercial or industrial building. When is a construction permit required?Ī permit is required when you construct, enlarge, repair, renovate, alter, reconstruct or demolish a building or structure or you change the use of a building. NJDCA Construction Permit Application Packet & related forms can be found here. Available Tuesdays, Wednesdays and ThursdaysĨ5 Borough of Collingswood's Borough Code is viewable in its entirety online here.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |